University of Utah Medical Center Fountain
Salt Lake City, UT
- Contract: $371,753
- Client: State of Utah
- Duration: 5 months
This project was a cast in place concrete/ masonry water feature. The architect designed a 200 foot water channel connecting two source pools to the main feature pool. The pump came fully contained as a skid mounted pre-package
pump system. The challenge for the project was constructing the radius concrete walls faced with masonry on a very tight schedule, with a very limited staging area. The hospital remained in full operation during the course of construction.
View next 'Unique' project