Upper Still Water Dam

Altamont, UT
  • Contract: $545,054
  • Client: Bureau of Reclamation
  • Duration: 4 months
The slope stabilization project of left abutment of Upper Stillwater Dam was located on a 50 acre area. The project included installation of double twist wire mesh, cable netting on rock face, drilling and grouting of 24’ rock bolts as well as installation of 600’ of gabion basket.