Bear River Bird Migratory Radial Gate Replacement

Brigham City, UT
  • Contract: $419,894
  • Client: U.S. Fish and Wildlife
  • Duration: 6 months
This U.S. Fish and Wildlife project required the contractor to schedule his work around the flow of the Bear River while fabricating and installing new power operated radial gates and constructing a new precast bridge deck. Delaminating concrete was removed from the spillway walls and replaced with epoxy grout patching. Steel walkways were fabricated and installed to allow access for service of the gates.